21.9 MW generation in Brown, NE · In queue since December 2022 · Proposed COD June 2024
21.9 MW
Capacity
1
Components
Other
3y 10m
In Queue
IA Executed
IA Phase
COD target: 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1y 6m
Schedule
29 months past proposed COD
Study Phase
Surplus; 02 NEBRASKA
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
IA FULLY EXECUTED/ON SCHEDULE
Project under construction
Typical: 12–36 months
Proposed COD: 2024-06-21
SPP-GEN-2023-SR1 is a proposed 21.9 MW generation project in Brown County, Nebraska, within the Southwest Power Pool (SPP) region. The project's technology is classified as "Other," with a single component of 21.9 MW. The transmission owner is the Nebraska Public Power District (NPPD), and the proposed point of interconnection is the Ainsworth Wind 115 kV substation. No project name or developer is identified in the available data.
The project entered the SPP interconnection queue on December 5, 2022, and remains in active status. It is being processed under SPP's surplus interconnection service, with a study phase designation of "Surplus; 02 NEBRASKA." It has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). An interconnection agreement has been executed for the project, and its proposed commercial operation date is June 21, 2024.
Generated from interconnection queue and public data sources
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NE
County
Brown
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
NPPD
Entity
SPP
Service Type
NRIS/ERIS
Point of Interconnection
Ainsworth Wind 115 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- NPPD.AINSICGEN
- POI Substation
- Ainsworth Wind Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.