SPP-GEN-2023-199
250 MW hybrid in Dakota, NE · In queue since October 2023 · Proposed COD November 2030
250 MW
Capacity
1
Components
Solar
3y 1m
In Queue
Facility Study
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 1m
Study Phase
DISIS-2023-001; 02 NEBRASKA
Interconnection request submitted to ISO/RTO
IA FULLY EXECUTED/ON SCHEDULE
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-11-01
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
SPP-GEN-2023-199 is a proposed solar-plus-battery hybrid development project located in Dakota County, Nebraska. The project has a total capacity of 250 MW. The listed components include a 250 MW solar component, and the project is classified as incorporating both solar and battery technologies. No separate capacity figure is provided for the battery component. The developer is not identified in the available data. The project would interconnect at the Twin Church 230 kV Substation within the Nebraska Public Power District (NPPD) service territory.
The project is in the Southwest Power Pool (SPP) interconnection queue, which it entered on October 2, 2023, and it currently holds active status. It is being evaluated in SPP's Definitive Interconnection System Impact Study cluster DISIS-2023-001, within the 02 Nebraska study group. The project has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). Its interconnection agreement status is listed as "Facility Study," and its proposed commercial operation date is November 1, 2030.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- SPP queue source as of: Oct 22, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NE
County
Dakota
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
NPPD
Entity
SPP
Service Type
NRIS/ERIS
Point of Interconnection
Twin Church 230 kV Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- Twin Church Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.