SPP-GEN-2023-153
120 MW hybrid in Perkins, NE · In queue since October 2023 · Proposed COD November 2029
120 MW
Capacity
1
Components
Solar
3y 1m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 1m
Study Phase
DISIS-2023-001; 02 NEBRASKA
Interconnection request submitted to ISO/RTO
IA FULLY EXECUTED/ON SCHEDULE
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-11-01
About
Generated Apr 10, 2026 · Predates Oct 22, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
SPP-GEN-2023-153 is a proposed 120 MW hybrid solar and battery project located in Perkins County, Nebraska. The project, which consists of 120 MW of solar capacity, is in the Southwest Power Pool (SPP) interconnection queue as of October 2, 2023. Tri-State is listed as the utility.
The proposed commercial operation date is August 31, 2028. The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Grant 115 kV Substation.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- SPP queue source as of: Oct 22, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NE
County
Perkins
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
Tri-State
Entity
SPP
Service Type
NRIS/ERIS
Point of Interconnection
Grant 115 kV Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- Grant Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
GSPP Held LLC CSG
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
NE Renewable Power West Enfield
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
GSPP 409 Ferris Road
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
NE Renewable Power Jonesboro
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.