Project SPP-GEN-2023-057 — Project Summary

Queue ID
SPP-GEN-2023-057
Capacity
150 MW
Technology
Battery
Status
active
Location
Pawnee, OK
Region
SPP
Developer
—
IA Status
Facility Study

SPP-GEN-2023-057

SPP-GEN-2023-057BetaActiveBatterySPPLBNL + Live

150 MW storage in Pawnee, OK · In queue since October 2023 · Proposed COD May 2028

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

150 MW

Capacity

1

Components

Battery

3y 1m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 7m

Study Phase

DISIS-2023-001; 04 SOUTHEAST

Facilities Study50%
Queue EntryOct 2, 2023

Interconnection request submitted to ISO/RTO

DISIS StudyCurrent

IA FULLY EXECUTED/ON SCHEDULE

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-31

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

SPP-GEN-2023-057 is a proposed battery energy storage development project located in Pawnee County, Oklahoma. The project has a total capacity of 150 MW, consisting entirely of a single battery storage component. It is situated within the Southwest Power Pool (SPP) region, with the Grand River Dam Authority (GRDA) identified as the associated utility. The project's point of interconnection is the Pawnee Switch 138 kV substation, and it has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS).

The project entered the SPP interconnection queue on October 2, 2023, and is currently listed with an active status. It is being evaluated as part of the DISIS-2023-001 study cluster in the 04 Southeast study area, and its interconnection agreement status is at the Facility Study stage. The proposed commercial operation date for the project is May 31, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • SPP queue source as of: Oct 22, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OK

County

Pawnee

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

GRDA

Entity

SPP

Service Type

NRIS/ERIS

Point of Interconnection

Pawnee Switch 138 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
POI Substation
Pawnee

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.