SPP-GEN-2022-100
80 MW hybrid in Cooper, MO · In queue since March 2023 · Proposed COD April 2029
80 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 1m
Study Phase
DISIS-2022-001; 03 CENTRAL
Interconnection request submitted to ISO/RTO
IA FULLY EXECUTED/ON SCHEDULE
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-04-28
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
SPP-GEN-2022-100 is a proposed hybrid solar and battery storage development project located in Cooper County, Missouri. The project has a total capacity of 80 MW, with the solar component listed at 80 MW. Although battery storage is included in its technology description, no separate capacity figure for the battery component is provided in the queue data. The project would interconnect at the Overton - Sedalia East 161 kV Substation, within the service territory of KCPL, and is seeking both Network Resource Interconnection Service and Energy Resource Interconnection Service (NRIS/ERIS).
The project is listed as active in the Southwest Power Pool (SPP) interconnection queue, which it entered on March 24, 2023. It is being evaluated as part of the DISIS-2022-001 study cluster in the 03 Central study area. The interconnection agreement process is currently at the Facility Study stage. The project has a proposed commercial operation date of April 28, 2029. No developer has been publicly identified in the available queue data.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- SPP queue source as of: Oct 22, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MO
County
Cooper
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
KCPL
Entity
SPP
Service Type
NRIS/ERIS
Point of Interconnection
Overton - Sedalia East 161 kV Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- Sedalia
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.