Project SPP-GEN-2021-107 — Project Summary

Queue ID
SPP-GEN-2021-107
Capacity
201.6 MW
Technology
Solar
Status
active
Location
Pottawatomie, KS
Region
SPP
Developer
—
IA Status
Facility Study

SPP-GEN-2021-107

SPP-GEN-2021-107BetaActiveSolarSPPLBNL + Live

201.6 MW generation in Pottawatomie, KS · In queue since May 2021 · Proposed COD October 2031

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

201.6 MW

Capacity

1

Components

Solar

5y 5m

In Queue

Facility Study

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 5m

Study Phase

DISIS-2021-001; 03 CENTRAL

Facilities Study50%
Queue EntryMay 20, 2021

Interconnection request submitted to ISO/RTO

DISIS StudyCurrent

IA FULLY EXECUTED/ON SCHEDULE

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-10-31

About

SPP-GEN-2021-107 is a proposed 201.6 MW solar development project located in Pottawatomie County, Kansas. The project is listed in the interconnection queue of the Southwest Power Pool (SPP), with the transmission owner identified as WERE. It is designed to connect to the grid at the Evergy 345 kV Jeffrey Energy Center point of interconnection. The developer of the project is not identified in the available queue data.

The project entered the SPP interconnection queue on May 20, 2021, and remains in active status. It is being evaluated as part of the DISIS-2021-001 study cluster (03 Central) and is currently in the Facility Study phase of the interconnection process. The project has requested Energy Resource Interconnection Service (ERIS). Its proposed commercial operation date is October 31, 2031.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

KS

County

Pottawatomie

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

WERE

Entity

SPP

Service Type

ERIS

Point of Interconnection

Evergy 345kV Jeffrey Energy Center

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
HIGH
POI Substation
Center St

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2021-107
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.