Project SPP-GEN-2021-064 — Project Summary

Queue ID
SPP-GEN-2021-064
Capacity
100 MW
Technology
Solar+Battery
Status
active
Location
Caddo, OK
Region
SPP
Developer
—
IA Status
Facility Study

SPP-GEN-2021-064

SPP-GEN-2021-064BetaActiveSolarBatterySPPLBNL + Live

100 MW hybrid in Caddo, OK · In queue since April 2021 · Proposed COD July 2028

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

100 MW

Capacity

1

Components

Solar

5y 6m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 3m

Study Phase

DISIS-2021-001; 04 SOUTHEAST

Facilities Study50%
Queue EntryApr 28, 2021

Interconnection request submitted to ISO/RTO

DISIS StudyCurrent

IA FULLY EXECUTED/ON SCHEDULE

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-15

About

SPP-GEN-2021-064 is a proposed solar and battery storage hybrid development project located in Caddo County, Oklahoma. The project has a total capacity of 100 MW, with the solar component listed at 100 MW. A battery component is included in the project's technology designation, though a separate capacity for the storage portion is not specified in the queue data. The project would interconnect at the Carnegie South 138kV point of interconnection within the American Electric Power (AEP) utility area. No developer is identified in the available data.

The project is in the Southwest Power Pool (SPP) interconnection queue, which it entered on April 28, 2021, and its queue status is currently active. It is being evaluated in the DISIS-2021-001 cluster study (04 Southeast area) and has requested both Network Resource Interconnection Service and Energy Resource Interconnection Service (NRIS/ERIS). Its interconnection agreement status is listed as Facility Study, indicating it has not yet executed an interconnection agreement. The proposed commercial operation date is July 15, 2028.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OK

County

Caddo

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

AEP

Entity

SPP

Service Type

NRIS/ERIS

Point of Interconnection

Carnegie South 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
POI Substation
Carnegie

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2021-064
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.