SPP-GEN-2021-033
204.12 MW generation in Franklin, AR · In queue since May 2021 · Proposed COD December 2028
204.12 MW
Capacity
1
Components
Solar
5y 5m
In Queue
IA Executed
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 7m
Study Phase
DISIS-2021-001; 04 SOUTHEAST
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
IA FULLY EXECUTED/ON SCHEDULE
Project under construction
Typical: 12–24 months
Proposed COD: 2028-12-31
SPP-GEN-2021-033 is a proposed 204.12 MW solar generation project located in Franklin County, Arkansas. The development project is a single-technology solar facility and does not include a battery storage or other hybrid component. No developer is identified in the available interconnection data. The project is proposed to connect to the transmission system at the Branch 161kV Substation, within the service territory of OGE (Oklahoma Gas and Electric).
The project entered the Southwest Power Pool (SPP) interconnection queue on May 14, 2021, and currently holds an active status. It was evaluated as part of SPP's Definitive Interconnection System Impact Study cluster DISIS-2021-001, within the 04 Southeast study group. The project has requested Energy Resource Interconnection Service (ERIS). An interconnection agreement has been executed, marking an advanced stage in the queue process. The proposed commercial operation date is December 31, 2028.
Generated from interconnection queue and public data sources
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
AR
County
Franklin
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
OGE
Entity
SPP
Service Type
ERIS
Point of Interconnection
Branch 161kV Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- POI Substation
- Pheasant Branch
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project SPP-GEN-2021-033Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.