SPP-GEN-2021-025
203.04 MW generation in Woodward, OK · In queue since May 2021 · Proposed COD December 2026
203.04 MW
Capacity
1
Components
Wind
5y 2m
In Queue
Facility Study
IA Phase
COD target: 2026
Total Duration
5y 7m
Study Phase
DISIS-2021-001; 04 SOUTHEAST
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-01
SPP-GEN-2021-025 is a proposed wind generation project located in Woodward County, Oklahoma, within the Southwest Power Pool (SPP) region. The project, with a total capacity of 203.04 MW, is being developed by Western Farmers Electric Cooperative (WFEC). It consists of 203.04 MW of wind generation.
The project entered the SPP interconnection queue on May 14, 2021, and has a proposed commercial operation date of December 1, 2026. Its interconnection status is currently in the System Impact Study phase. The point of interconnection (POI) is the Western Farmers 138kV Mooreland Substation.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OK
County
Woodward
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
WFEC
Entity
SPP
Service Type
ERIS
Point of Interconnection
Western Farmers 138kV Mooreland Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WFEC_MOORELAND_2
- POI Substation
- Mooreland
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project SPP-GEN-2021-025Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.