SPP-GEN-2020-072
150 MW hybrid in Henry, MO · In queue since April 2020 · Proposed COD April 2030
150 MW
Capacity
1
Components
Solar
6y 6m
In Queue
IA Executed
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
10 years
Study Phase
DISIS-2020-001; 03 CENTRAL
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
IA FULLY EXECUTED/ON SCHEDULE
Project under construction
Typical: 18–30 months
Proposed COD: 2030-04-01
Queue ID SPP-GEN-2020-072 is a proposed solar-plus-battery hybrid development project in Henry County, Missouri, with a total capacity of 150 MW. The project combines solar photovoltaic generation and battery energy storage. The solar component accounts for 150 MW, and no separate capacity figure is listed for the battery component. The developer is not identified in the available data. The proposed project would interconnect to the system of GMO at a point of interconnection on the Windsor to AEC Sedalia 161 kV line.
The project is in the Southwest Power Pool (SPP) interconnection queue, which it entered on April 30, 2020, and it currently holds active status. It was studied in SPP's Definitive Interconnection System Impact Study cluster DISIS-2020-001, within the 03 CENTRAL study area. The project has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). An interconnection agreement has been executed. The proposed commercial operation date is April 1, 2030, nearly ten years after the project's initial queue entry.
Generated from interconnection queue and public data sources
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MO
County
Henry
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
GMO
Entity
SPP
Service Type
NRIS/ERIS
Point of Interconnection
Windsor to AEC Sedalia 161 kV line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- Sedalia
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.