Project SPP-GEN-2020-020 — Project Summary

Queue ID
SPP-GEN-2020-020
Capacity
201.6 MW
Technology
Solar+Battery
Status
active
Location
Mccurtain, OK
Region
SPP
Developer
—
IA Status
IA Executed

SPP-GEN-2020-020

SPP-GEN-2020-020BetaActiveSolarBatterySPPLBNL + Live

201.6 MW hybrid in Mccurtain, OK · In queue since April 2020 · Proposed COD November 2027

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

201.6 MW

Capacity

1

Components

Solar

6y 6m

In Queue

IA Executed

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 7m

Study Phase

DISIS-2020-001; 04 SOUTHEAST

Construction75%
Queue EntryApr 28, 2020

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

IA FULLY EXECUTED/ON SCHEDULE

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-11-15

About

SPP-GEN-2020-020 is a proposed solar-plus-battery hybrid development project in McCurtain County, Oklahoma, with a total capacity of 201.6 MW. The project's listed components include 201.6 MW of solar generation along with a battery storage element, for which no separate capacity is specified in the queue data. No developer is identified in the available records. The project would connect to the transmission system of AEP at a point of interconnection on the 345 kV Northwest Texarkana–Valliant line, via a tap of that line.

The project entered the Southwest Power Pool (SPP) interconnection queue on April 28, 2020, and remains in active status. It was studied as part of the DISIS-2020-001 cluster in the 04 Southeast area, and it has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). An interconnection agreement has been executed for the project, and its proposed commercial operation date is November 15, 2027.

Generated from interconnection queue and public data sources

Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

OK

County

Mccurtain

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

AEP

Entity

SPP

Service Type

NRIS/ERIS

Point of Interconnection

Tap the 345 kV Northwest Texarkana - Valliant line

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2020-020
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.