SPP-GEN-2020-010
140 MW hybrid in Woodward, OK · In queue since April 2020 · Proposed COD December 2029
140 MW
Capacity
1
Components
Solar
6y 6m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
9y 8m
Study Phase
DISIS-2020-001; 04 SOUTHEAST
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-30
SPP-GEN-2020-010 is a proposed hybrid solar and battery storage development project located in Woodward County, Oklahoma. The project has a total capacity of 140 MW and appears in the interconnection queue of the Southwest Power Pool (SPP). The listed component data specifies 140 MW of solar generation, and no separate capacity figure is provided for the battery storage element. The project is proposed to interconnect at the Seiling-Taloga Substations 138kV point of interconnection within the Western Farmers Electric Cooperative (WFEC) transmission system. It has requested both Network Resource Interconnection Service and Energy Resource Interconnection Service (NRIS/ERIS). No developer is identified in the available data.
The project entered the SPP interconnection queue on April 8, 2020, and is being studied as part of the DISIS-2020-001 cluster in the 04 Southeast study group. Its interconnection agreement status is listed as Facility Study. The project's overall queue status is currently suspended. It has a proposed commercial operation date of December 30, 2029.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OK
County
Woodward
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
WFEC
Entity
SPP
Service Type
NRIS/ERIS
Point of Interconnection
Seiling-Taloga Substations 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project SPP-GEN-2020-010Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.