Project SPP-GEN-2019-054 — Project Summary

Queue ID
SPP-GEN-2019-054
Capacity
150 MW
Technology
Solar
Status
suspended
Location
Barton, KS
Region
SPP
Developer
—
IA Status
Suspended

SPP-GEN-2019-054

SPP-GEN-2019-054BetaSuspendedSolarSPPLBNL + Live

150 MW generation in Barton, KS · In queue since May 2019 · Proposed COD August 2029

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

150 MW

Capacity

1

Components

Solar

7y 5m

In Queue

Suspended

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 3m

Study Phase

DISIS-2019-001; 03 CENTRAL

Suspended38%
Queue EntryMay 24, 2019

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-08-31

About

SPP-GEN-2019-054 is a proposed 150 MW solar generation project located in Barton County, Kansas. The development project is listed in the interconnection queue of the Southwest Power Pool (SPP), with Sunflower Electric Power Corporation (SUNC) identified as the associated transmission utility. The project's proposed point of interconnection is the Great Bend–Circle 230 kV transmission line. It has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). No developer or project name is identified in the queue data.

The project entered the SPP queue on May 24, 2019, and was studied as part of the DISIS-2019-001 Definitive Interconnection System Impact Study cluster, within the 03 Central study group. Its proposed commercial operation date is August 31, 2029. The project's overall queue status is listed as suspended, and its interconnection agreement status is also recorded as suspended.

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

KS

County

Barton

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

SUNC

Entity

SPP

Service Type

NRIS/ERIS

Point of Interconnection

Great Bend- Circle 230kV line

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2019-054
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.