SPP-GEN-2018-131
221.4 MW generation in Pierce, NE · In queue since November 2018 · Proposed COD December 2031
221.4 MW
Capacity
1
Components
Solar
7y 11m
In Queue
IA Executed
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
13y 1m
Study Phase
DISIS-2018-002; 02 NEBRASKA
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
IA FULLY EXECUTED/ON SCHEDULE
Project under construction
Typical: 12–24 months
Proposed COD: 2031-12-01
SPP-GEN-2018-131 is a proposed 221.4 MW solar generation project located in Pierce County, Nebraska. The project is a standalone solar facility with no additional storage or hybrid components. It is situated within the service territory of the Nebraska Public Power District (NPPD) and is planned to interconnect at the Antelope – Hoskins 345 kV point of interconnection. No developer is identified in the available queue data.
The project entered the Southwest Power Pool (SPP) interconnection queue on November 21, 2018, and remains in active status. It was studied as part of the DISIS-2018-002 definitive interconnection system impact study cluster, within the 02 Nebraska study area. The project has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). An interconnection agreement has been executed, and the project's proposed commercial operation date is December 1, 2031.
Generated from interconnection queue and public data sources
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NE
County
Pierce
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
NPPD
Entity
SPP
Service Type
NRIS/ERIS
Point of Interconnection
Antelope - Hoskins 345 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ANTELOPE
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project SPP-GEN-2018-131Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.