Project SPP-GEN-2018-128 — Project Summary

Queue ID
SPP-GEN-2018-128
Capacity
200.22 MW
Technology
Wind
Status
active
Location
Sumner, KS
Region
SPP
Developer
—
IA Status
IA Executed

SPP-GEN-2018-128

SPP-GEN-2018-128BetaActiveWindSPPLBNL + Live

200.22 MW generation in Sumner, KS · In queue since November 2018 · Proposed COD June 2030

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

200.22 MW

Capacity

1

Components

Wind

7y 11m

In Queue

IA Executed

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

11y 7m

Study Phase

DISIS-2018-002; 03 CENTRAL

Construction75%
Queue EntryNov 19, 2018

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

IA FULLY EXECUTED/ON SCHEDULE

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2030-06-15

About

SPP-GEN-2018-128 is a proposed wind generation project in Sumner County, Kansas, with a planned capacity of 200.22 MW. The development project consists of a single wind component. It is located within the Southwest Power Pool (SPP) region, and the associated transmission owner is listed as WERE. The project would connect to the grid at the Renfrow-Viola 345 kV point of interconnection. It has requested both Network Resource Interconnection Service and Energy Resource Interconnection Service (NRIS/ERIS).

The project entered the SPP interconnection queue on November 19, 2018, and its queue status is active. It was studied as part of the DISIS-2018-002 Definitive Interconnection System Impact Study cluster, within the 03 Central study group. An interconnection agreement has been executed, which marks an advanced stage in the SPP interconnection process. The proposed commercial operation date is June 15, 2030.

Generated from interconnection queue and public data sources

Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

KS

County

Sumner

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

WERE

Entity

SPP

Service Type

NRIS/ERIS

Point of Interconnection

Renfrow-Viola 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2018-128
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.