SPP-GEN-2018-025
200 MW storage in Washington, NE · In queue since May 2018 · Proposed COD October 2030
200 MW
Capacity
1
Components
Battery
8y 5m
In Queue
Suspended
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
12y 5m
Study Phase
DISIS-2018-001; 02 NEBRASKA
Interconnection request submitted to ISO/RTO
IA FULLY EXECUTED/ON SCHEDULE
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-10-01
SPP-GEN-2018-025 is a proposed 200 MW battery energy storage development project located in Washington County, Nebraska. The project consists of a single battery storage component with a capacity of 200 MW. It is proposed to interconnect at the Fort Calhoun 345kV Substation within the service territory of the Omaha Public Power District (OPPD). No developer is identified in the available queue data.
The project is listed in the Southwest Power Pool (SPP) interconnection queue, which it entered on May 29, 2018. It requested Energy Resource Interconnection Service (ERIS) and was evaluated in the DISIS-2018-001 cluster study, within the 02 Nebraska study group. The project's queue status is active, though its interconnection agreement status is listed as suspended. The proposed commercial operation date is October 1, 2030.
Generated from interconnection queue and public data sources
Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NE
County
Washington
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
OPPD
Entity
SPP
Service Type
ERIS
Point of Interconnection
Fort Calhoun 345kV Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- Fort Calhoun Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project SPP-GEN-2018-025Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.