Project SPP-GEN-2018-009 — Project Summary

Queue ID
SPP-GEN-2018-009
Capacity
150 MW
Technology
Wind
Status
active
Location
Seward, KS
Region
SPP
Developer
—
IA Status
IA Executed

SPP-GEN-2018-009

SPP-GEN-2018-009BetaActiveWindSPPLBNL + Live

150 MW generation in Seward, KS · In queue since April 2018 · Proposed COD October 2030

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

150 MW

Capacity

1

Components

Wind

8y 6m

In Queue

IA Executed

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

12y 6m

Study Phase

DISIS-2018-001; 03 CENTRAL

Construction75%
Queue EntryApr 27, 2018

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

IA FULLY EXECUTED/ON SCHEDULE

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2030-10-31

About

SPP-GEN-2018-009 is a proposed 150 MW wind generation project located in Seward County, Kansas. The development project is listed in the interconnection queue of the Southwest Power Pool (SPP), with Sunflower Electric Power Corporation's transmission area (SUNC) identified as the interconnecting utility. No developer or project name has been disclosed in the queue data. The project consists of a single wind component totaling 150 MW and is proposed to connect to the grid at the Cimarron 115kV Substation.

The project entered the SPP queue on April 27, 2018, and was studied in the DISIS-2018-001 cluster within the 03 Central study group. It has requested Energy Resource Interconnection Service (ERIS). As of the latest queue data, the project holds an active status and has an executed interconnection agreement (IA Executed), which marks a significant milestone in the interconnection process. The proposed commercial operation date is October 31, 2030.

Generated from interconnection queue and public data sources

Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

KS

County

Seward

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

SUNC

Entity

SPP

Service Type

ERIS

Point of Interconnection

Cimarron 115kV Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
HIGH
POI Substation
Cimarron Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2018-009
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.