SPP-GEN-2017-201
250 MW generation in Wayne, NE · In queue since November 2017 · Proposed COD December 2028
250 MW
Capacity
1
Components
Wind
8y 11m
In Queue
IA Executed
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
11y 1m
Study Phase
DISIS-2017-002; 02 NEBRASKA
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
IA FULLY EXECUTED/ON SCHEDULE
Project under construction
Typical: 18–36 months
Proposed COD: 2028-12-31
SPP-GEN-2017-201 is a proposed 250 MW wind generation project located in Wayne County, Nebraska. The development project is in the interconnection queue of the Southwest Power Pool (SPP), with Nebraska Public Power District (NPPD) as the associated transmission utility. The project would consist entirely of wind generation and is proposed to connect to the grid at the Hoskins 345kV Substation. It has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS).
The project entered the SPP queue on November 30, 2017, and remains in active status. It was studied as part of the DISIS-2017-002 cluster in SPP's Definitive Interconnection System Impact Study process, within the 02 Nebraska study group. An interconnection agreement (IA) has been executed for the project, a key milestone in the interconnection process. The proposed commercial operation date is December 31, 2028.
Generated from interconnection queue and public data sources
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NE
County
Wayne
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
NPPD
Entity
SPP
Service Type
NRIS/ERIS
Point of Interconnection
Hoskins 345kV Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- Hoskins Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project SPP-GEN-2017-201Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.