Project SPP-GEN-2017-133 — Project Summary

Queue ID
SPP-GEN-2017-133
Capacity
200 MW
Technology
Wind
Status
active
Location
Oklahoma, OK
Region
SPP
Developer
—
IA Status
IA Executed

SPP-GEN-2017-133

SPP-GEN-2017-133BetaActiveWindSPPLBNL + Live

200 MW generation in Oklahoma, OK · In queue since November 2017 · Proposed COD June 2030

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

200 MW

Capacity

1

Components

Wind

8y 11m

In Queue

IA Executed

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

12y 7m

Study Phase

DISIS-2017-002; 04 SOUTHEAST

Construction75%
Queue EntryNov 22, 2017

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

IA FULLY EXECUTED/ON SCHEDULE

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2030-06-30

About

SPP-GEN-2017-133 is a proposed 200 MW wind generation project located in Oklahoma County, Oklahoma. The development project is listed in the interconnection queue of the Southwest Power Pool (SPP), with Oklahoma Gas and Electric (OGE) as the associated utility. No developer is identified in the available queue data. The project proposes to interconnect at the Arcadia 345 kV point of interconnection and has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS).

The project entered the SPP queue on November 22, 2017, and was studied as part of the DISIS-2017-002 cluster within the 04 Southeast study area. It remains in active status, and an interconnection agreement (IA) has been executed. The proposed commercial operation date is June 30, 2030, more than twelve years after the original queue entry.

Generated from interconnection queue and public data sources

Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

OK

County

Oklahoma

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

OGE

Entity

SPP

Service Type

NRIS/ERIS

Point of Interconnection

Arcadia 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
POI Substation
Arcadia Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.