Project SPP-GEN-2016-160 — Project Summary

Queue ID
SPP-GEN-2016-160
Capacity
20 MW
Technology
Battery
Status
active
Location
Ellis, KS
Region
SPP
Developer
—
IA Status
IA Executed

SPP-GEN-2016-160

SPP-GEN-2016-160BetaActiveBatterySPPLBNL + Live

20 MW storage in Ellis, KS · In queue since November 2016 · Proposed COD December 2026

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

20 MW

Capacity

1

Components

Battery

9y 11m

In Queue

IA Executed

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 1m

Study Phase

DISIS-2016-002-1; 03 CENTRAL

Construction75%
Queue EntryNov 21, 2016

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

IA FULLY EXECUTED/ON SCHEDULE

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-12-31

About

SPP-GEN-2016-160 is a proposed 20 MW battery energy storage development project located in Ellis County, Kansas. The project consists of a single battery component with a capacity of 20 MW. No developer is identified in the available data. The proposed project would connect to the grid at the Post Rock 230kV point of interconnection, within the service territory of the utility designated MIDW.

The project is listed as active in the Southwest Power Pool (SPP) interconnection queue, which it entered on November 21, 2016. It was studied as part of the DISIS-2016-002-1 cluster in the 03 CENTRAL study group. The project has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). Its interconnection agreement has been executed, and it has a proposed commercial operation date of December 31, 2026.

Generated from interconnection queue and public data sources

Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

KS

County

Ellis

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

MIDW

Entity

SPP

Service Type

NRIS/ERIS

Point of Interconnection

Post Rock 230kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
HIGH
Nearest Node (Estimated)
WR.MW.GMEC2.MW
POI Substation
Post Rock Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2016-160
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.