SPP-GEN-2016-004
202 MW generation in Oliver, ND · In queue since March 2016 · Proposed COD December 2027
202 MW
Capacity
1
Components
Wind
10y 7m
In Queue
IA Executed
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
11y 9m
Study Phase
DISIS-2016-001-3; 01 NORTH
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
IA FULLY EXECUTED/ON SCHEDULE
Project under construction
Typical: 18–36 months
Proposed COD: 2027-12-31
SPP-GEN-2016-004 is a proposed 202 MW wind generation project located in Oliver County, North Dakota. The development project is listed in the interconnection queue of the Southwest Power Pool (SPP), with Basin Electric Power Cooperative (BEPC) identified as the associated utility. The project consists of a single wind component totaling 202 MW and is proposed to connect to the grid at the Basin Electric 230 kV point of interconnection. It has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS).
The project entered the SPP queue on March 10, 2016, and remains in active status. It was evaluated as part of the DISIS-2016-001-3 cluster study within the 01 North study area. An interconnection agreement (IA) has been executed for the project, and its proposed commercial operation date is December 31, 2027.
Generated from interconnection queue and public data sources
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
ND
County
Oliver
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
BEPC
Entity
SPP
Service Type
NRIS/ERIS
Point of Interconnection
Basin Electric 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WAUE.BEPM.LOS1
- POI Substation
- Basin Electric Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project SPP-GEN-2016-004Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.