SPP-ERAS-2025-006
717.8 MW generation in Reno, KS · In queue since September 2025 · Proposed COD January 2030
717.8 MW
Capacity
1
Components
Gas
10 months
In Queue
In Progress (unknown study)
IA Phase
COD target: 2030
Total Duration
4y 4m
Study Phase
ERAS-2025-001; 03 CENTRAL
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-01-01
SPP-ERAS-2025-006 is a proposed 717.8 MW gas-fired generation project located in Reno County, Kansas. The project, which utilizes thermal combined cycle technology, is in the Southwest Power Pool (SPP) interconnection queue, with an entry date of September 30, 2025. The Point of Interconnection (POI) is the Reno County 345 kV Substation #1443.
The project is currently listed as active in the SPP queue and is seeking Energy Resource/Network Resource (ER/NR) service. The interconnecting utility is Western Electric Cooperative (WERE).
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
KS
County
Reno
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
WERE
Entity
SPP
Service Type
NRIS/ERIS
Point of Interconnection
Reno County 345 kV Substation #1443
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- POI Substation
- Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project SPP-ERAS-2025-006Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.