SPP-ASGI-2021-003
40 MW generation in — · In queue since April 2021
40 MW
Capacity
0
Components
5y 6m
In Queue
—
IA Status
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 6m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-ASGI-2021-003 is a proposed hybrid solar and battery storage generation project in the Southwest Power Pool (SPP) interconnection queue. The development project has a total capacity of 40 MW and combines solar photovoltaic generation with energy storage. The available data does not break out the capacities of the solar and storage components, and it does not identify the project's developer or its specific county and state.
The project entered the SPP queue on April 23, 2021, under queue identifier SPP-ASGI-2021-003. Its status is listed as active. The project has requested both Energy Resource (ER) and Network Resource (NR) interconnection service, which together cover delivery of energy to the grid and designation as a network resource for serving load. The provided data does not specify a proposed commercial operation date or the status of an interconnection agreement. The project is not linked to an existing operating plant in EIA records.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
—
County
—
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
—
Entity
SPP
Service Type
ER/NR
Data Source
Live · SPP
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.