Project SPP-ASGI-2020-003 — Project Summary

Queue ID
SPP-ASGI-2020-003
Capacity
35 MW
Technology
Solar+Battery
Status
active
Location
—
Region
SPP
Developer
—
IA Status
—

SPP-ASGI-2020-003

SPP-ASGI-2020-003BetaActiveHybrid / Solar/StorageSPPLive · SPP

35 MW generation in — · In queue since April 2020

ISO/RTO: SPP

35 MW

Capacity

0

Components

6y 6m

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 6m

Pre-Study0%
Queue EntryApr 30, 2020

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-ASGI-2020-003 is a proposed hybrid solar and battery storage generation project in the interconnection queue of the Southwest Power Pool (SPP), the regional transmission organization that administers it. The project has a total capacity of 35 megawatts (MW) and is classified under the technology category "Hybrid / Solar/Storage." The available data does not break the total into individual capacities for the solar and battery components. No project name, developer, or county and state location has been disclosed, so the project is identified by its queue ID.

The project entered the SPP queue on April 30, 2020, and its status is active. The queue ID's "ASGI" designation indicates an Affected System Generator Interconnection request, a category SPP uses for generators whose interconnection to a neighboring system may affect SPP's transmission network. The project requested Energy Resource (ER) interconnection service. The available data does not include a proposed commercial operation date or the status of an interconnection agreement. The project has no recorded link to an existing operating plant in U.S. Energy Information Administration data, and no recent news coverage of it has been identified.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

—

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

SPP

Service Type

ER

Data Source

Live · SPP

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-ASGI-2020-003
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.