Project SPP-ASGI-2018-006 — Project Summary

Queue ID
SPP-ASGI-2018-006
Capacity
20 MW
Technology
Solar
Status
active
Location
Vernon County, MO
Region
SPP
Developer
—
IA Status
—

SPP-ASGI-2018-006

SPP-ASGI-2018-006BetaActiveSolarSPPLive · SPP

20 MW generation in Vernon County, MO · In queue since July 2018

BA: AECIISO/RTO: SPPNERC: SERCRC: MISO

20 MW

Capacity

0

Components

8y 3m

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 3m

Pre-Study0%
Queue EntryJul 26, 2018

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-ASGI-2018-006 is a proposed 20 MW solar generation project in Vernon County, Missouri. The development project sits within the Southwest Power Pool (SPP) region, and GMO is listed as the associated utility. No project name or developer has been disclosed in the available queue data, so the project is identified by its queue ID.

The project entered the SPP interconnection queue on July 26, 2018, and its status is currently active. Its "ASGI" designation indicates it is handled through SPP's Affected System Generator Interconnection process. The proposed point of interconnection is the Tap Metz-Dederick Junction 34.5 kV line. The project has requested Energy Resource (ER) interconnection service. The available data does not specify a proposed commercial operation date or the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MO

County

Vernon County

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

GMO

Entity

SPP

Service Type

ER

Point of Interconnection

Tap Metz-Dederick Junction 34.5kV

Data Source

Live · SPP

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
HIGH
POI Substation
Junction

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-ASGI-2018-006
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.