SPP-2025-G1
250 MW generation in Weld County,, CO · In queue since January 2025 · Proposed COD January 2028
250 MW
Capacity
0
Components
1y 10m
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3 years
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-01-01
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
SPP-2025-G1 is a proposed hybrid solar and battery storage generation project in Weld County, Colorado, with a total capacity of 250 MW. The development project pairs solar photovoltaic generation with battery energy storage. The data does not break the total down into capacities for the solar and storage components. No developer has been publicly identified in the available queue data. The project would interconnect at the Ault 345 kV station, and the Western Area Power Administration (WAPA) is listed as the associated transmission utility.
The project is in the Southwest Power Pool (SPP) interconnection queue, which it entered on January 14, 2025, and its status is active. It has requested both Energy Resource (ER) and Network Resource (NR) interconnection service, and its proposed commercial operation date is January 1, 2028. The available data does not indicate the status of an interconnection agreement. The project is not currently linked to an existing operating plant in U.S. Energy Information Administration records.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- SPP queue source as of: Oct 22, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CO
County
Weld County,
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
WAPA
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Ault 345 station
Data Source
Live · SPP
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
GSPP Held LLC CSG
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
G2 Energy Ostrom Road LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
NE Renewable Power West Enfield
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
GSPP 409 Ferris Road
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.