SPP-2023-G2
150 MW generation in Albany County, WY · In queue since November 2022 · Proposed COD December 2026
150 MW
Capacity
0
Components
3y 11m
In Queue
—
IA Status
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-01
SPP-2023-G2 is a proposed hybrid solar and battery storage generation project located in Albany County, Wyoming. The development project has a total capacity of 150 MW and combines solar photovoltaic generation with energy storage. Individual capacities for the solar and storage components are not specified in the available data. No developer has been publicly identified. The project would connect to the transmission system at the Northpark – Terry Ranch 230 kV point of interconnection, within a service area associated with the Western Area Power Administration (WAPA).
The project is listed in the Southwest Power Pool (SPP) interconnection queue, which it entered on November 18, 2022. It holds an active status and has requested both Energy Resource (ER) and Network Resource (NR) interconnection service. The proposed commercial operation date is December 1, 2026. The available data do not indicate the status of an interconnection agreement for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WY
County
Albany County
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
WAPA
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Northpark - Terry Ranch 230-
Data Source
Live · SPP
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project SPP-2023-G2Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.