Project SOCO-25-IC-1384 — Project Summary

Queue ID
SOCO-25-IC-1384
Capacity
88 MW
Technology
Solar+Battery
Status
active
Location
Tift, GA
Region
Southeast
Developer
—
IA Status
Facility Study

SOCO-25-IC-1384

SOCO-25-IC-1384BetaActiveSolarBatterySOCOLBNL

88 MW hybrid in Tift, GA · In queue since April 2025 · Proposed COD February 2029

BA: SOCONERC: SERCRC: SOCO

88 MW

Capacity

1

Components

Solar

1y 7m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 10m

Facilities Study50%
Queue EntryApr 17, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-02-25

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Queue ID SOCO-25-IC-1384 is a proposed hybrid solar and battery storage development project in Tift County, Georgia, in the southeastern United States. The project has a total capacity of 88 MW. The component data lists only the solar portion, at 88 MW, and no separate capacity figure is given for the battery component. No developer is identified in the available data.

The project is in the Southern Company (SOCO) interconnection queue, which it entered on April 17, 2025, and its queue status is active. It has requested Energy Resource Interconnection Service (ERIS) at a point of interconnection on the Moultrie – North Tifton 115 kV line. Its interconnection agreement process is currently at the Facility Study stage. The proposed commercial operation date is February 25, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Tift

Grid Region

Southeast

Market

—

Developer

—

Utility

Southern Company

Entity

SOCO

Service Type

ERIS

Point of Interconnection

Moultrie - North Tifton 115 kV Line

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.