Project SOCO-25-IC-1375 — Project Summary

Queue ID
SOCO-25-IC-1375
Capacity
325 MW
Technology
Battery
Status
active
Location
Jackson, GA
Region
Southeast
Developer
—
IA Status
Cluster Study

SOCO-25-IC-1375

SOCO-25-IC-1375BetaActiveBatterySOCOLBNL

325 MW storage in Jackson, GA · In queue since April 2025 · Proposed COD July 2031

BA: SOCONERC: SERCRC: SOCO

325 MW

Capacity

1

Components

Battery

1y 7m

In Queue

Cluster Study

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 3m

Impact Study25%
Queue EntryApr 17, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-07-30

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

SOCO-25-IC-1375 is a proposed battery energy storage development project located in Jackson County, Georgia, in the southeastern United States. The project has a total proposed capacity of 325 megawatts (MW), consisting entirely of a single battery storage component. No developer or project name has been publicly identified in the available queue data. The project would interconnect to the transmission system operated by Southern Company at a point of interconnection on the Center Primary – Pond Fork 230 kV line.

The project entered the Southern Company (SOCO) interconnection queue on April 17, 2025, and holds an active status. It has requested Energy Resource Interconnection Service (ERIS). As of the latest available data, its interconnection agreement status is listed as "Cluster Study," indicating that it is undergoing evaluation as part of a group of interconnection requests. The proposed commercial operation date is July 30, 2031.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Jackson

Grid Region

Southeast

Market

—

Developer

—

Utility

Southern Company

Entity

SOCO

Service Type

ERIS

Point of Interconnection

Center Primary - Pond Fork 230 kV Line

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.