S-C-282
120 MW generation in Marion, SC · In queue since January 2025 · Proposed COD September 2030
120 MW
Capacity
1
Components
Solar
1y 10m
In Queue
Cluster Study
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 8m
Study Phase
2025 Cluster
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-09-01
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
S-C-282 is a proposed 120 MW solar generation project located in Marion County, South Carolina, in the southeastern United States. The project consists of a single solar component with a capacity of 120 MW. No project name or developer is identified in the available interconnection queue data, and the project is therefore referred to by its queue identifier. The proposed project is seeking to interconnect with the transmission system of Santee Cooper, South Carolina's state-owned electric and water utility.
The project entered the Santee Cooper interconnection queue on January 3, 2025, and is listed with an active status. It has requested Network Resource Interconnection Service (NRIS) and is being evaluated as part of the utility's 2025 Cluster study phase. Its interconnection agreement status is listed as "Cluster Study," indicating that an interconnection agreement has not yet been executed. The proposed commercial operation date for the development project is September 1, 2030.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
SC
County
Marion
Grid Region
Southeast
Market
—
Developer
—
Utility
Santee Cooper
Entity
S-C
Service Type
NRIS
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project S-C-282Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.