Project PSCo-GI-2025-09 — Project Summary

Queue ID
PSCo-GI-2025-09
Capacity
400 MW
Technology
Solar
Status
active
Location
Cheyenne, CO
Region
West
Developer
—
IA Status
In Progress (unknown study)

PSCo-GI-2025-09

PSCo-GI-2025-09BetaActiveSolarPSCoLBNL

400 MW generation in Cheyenne, CO · In queue since April 2025 · Proposed COD December 2029

BA: PSCONERC: WECCRC: SPPW

400 MW

Capacity

1

Components

Solar

1y 7m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 8m

Study Phase

DISIS-2025-008

In Study38%
Queue EntryApr 25, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-31

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Queue ID PSCo-GI-2025-09 is a proposed 400 MW solar generation project located in Cheyenne County, Colorado, in the western United States. The development project consists of a single solar component with a capacity of 400 MW. No developer is identified in the available data. The project is in the interconnection queue of Public Service Company of Colorado (PSCo). It proposes to connect at the Shortgrass-Goose Creek 345 kV line as its point of interconnection.

The project entered the PSCo queue on April 25, 2025, and holds an active status. It has requested Network Resource Interconnection Service (NRIS) and is being evaluated as part of the DISIS-2025-008 definitive interconnection system impact study cluster. Its interconnection agreement status is listed as in progress, though the specific study stage is not identified. The proposed commercial operation date is December 31, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CO

County

Cheyenne

Grid Region

Mountain West

Market

—

Developer

—

Utility

Public Service Company Of Colorado

Entity

PSCo

Service Type

NRIS

Point of Interconnection

Shortgrass-Goose Creek 345 kV line

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.