Wagenhals 138 kV
200 MW storage in Stark, OH · In queue since April 2026 · Proposed COD June 2030
200 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 2m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-30
Wagenhals 138 kV is a proposed 200 MW battery energy storage development project in Stark County, Ohio. The project is being developed by IOWN Energy Projects LLC and would interconnect to the transmission system at the Wagenhals 138 kV point of interconnection, within the service territory of AEP. As a standalone storage facility, the project is classified under the storage project type, with its full 200 MW of capacity attributed to battery technology.
The project is listed in the PJM Interconnection queue under queue ID PJM-C01-2253, with a queue entry date of April 27, 2026. It has requested Generation Interconnection service and is currently in active status as part of PJM's C01 study phase. The proposed commercial operation date is June 30, 2030. The available data does not indicate that an interconnection agreement has been executed.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OH
County
Stark
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
IOWN Energy Projects LLC
Utility
AEP
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Wagenhals 138 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WAGENHAL138 KV T1
- POI Substation
- Wagenhals Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Wagenhals 138 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.