Harrowgate - Locks 115 kV
44.16 MW generation in Chesterfield, VA · In queue since April 2026 · Proposed COD March 2028
44.16 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1y 11m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-01
Harrowgate - Locks 115 kV is a proposed 44.16 MW solar generation project located in Chesterfield County, Virginia. The development project is being advanced by Chester Solar Technology Park, LLC, and would connect to the transmission system of Dominion, the local utility. The project takes its name from its planned point of interconnection, the Harrowgate - Locks 115 kV line.
The project is listed in the interconnection queue of PJM Interconnection under queue ID PJM-C01-2216, with a queue entry date of April 27, 2026. It is seeking generation interconnection service and is currently in the C01 study phase, part of PJM's cycle-based interconnection process. As of the latest available data, the project's queue status is active, and it has a proposed commercial operation date of March 1, 2028. No interconnection agreement status was reported in the available data.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Chesterfield
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Chester Solar Technology Park, LLC
Utility
Dominion
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Harrowgate - Locks 115 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Harrowgate - Locks 115 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.