Dickerson H 230 kV (PJM-C01-2160) — Project Summary

Queue ID
PJM-C01-2160
Capacity
200 MW
Technology
Gas
Status
active
Location
Montgomery, MD
Region
PJM
Developer
Terrapin Power Holdings, LLC (Dickerson Power, LLC)
IA Status
—

Dickerson H 230 kV

PJM-C01-2160BetaActiveNatural GasPJMlive-pjm_cycle

200 MW generation in Montgomery, MD · In queue since April 2026 · Proposed COD July 2029

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

200 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 3m

Study Phase

C01

Pre-Study0%
Queue EntryApr 27, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-18

About

Dickerson H 230 kV (queue ID PJM-C01-2160) is a proposed 200 MW natural gas generation project in Montgomery County, Maryland. The developer is listed as Terrapin Power Holdings, LLC, through its affiliate Dickerson Power, LLC. The project would connect to the transmission system at the Dickerson H 230 kV point of interconnection, within the service territory of PEPCO. It is linked to an existing operating facility in U.S. Energy Information Administration records, the Dickerson Power plant (EIA plant ID 1572), with a match confidence of 0.82.

The project is in the PJM Interconnection queue, which it entered on April 27, 2026, under a Generation Interconnection service request. It is currently active and being evaluated in the C01 study phase, part of PJM's cycle-based interconnection process. The proposed commercial operation date is July 18, 2029. The available data does not indicate that an interconnection agreement has been executed.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MD

County

Montgomery

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Terrapin Power Holdings, LLC (Dickerson Power, LLC)

Utility

PEPCO

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Dickerson H 230 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
50823
POI Substation
Dickerson D Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Dickerson H 230 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.