TSS 903 Tovey 345 kV
500 MW storage in Christian, IL · In queue since April 2026 · Proposed COD October 2030
500 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 6m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-10-31
TSS 903 Tovey 345 kV is a proposed 500 MW battery energy storage project located in Christian County, Illinois. The development project is being pursued by Switchgrass Energy Storage, LLC, and would connect to the transmission system at the TSS 903 Tovey 345 kV point of interconnection, within the ComEd utility service territory. The project is classified as a standalone storage facility, with its full 500 MW capacity attributed to battery storage technology.
The project is listed in the PJM Interconnection queue under queue ID PJM-C01-2154. It entered the queue on April 27, 2026, and holds an active status. It has requested Generation Interconnection service and is currently being evaluated in study phase C01. The proposed commercial operation date is October 31, 2030. The provided data does not indicate that an interconnection agreement has been executed.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Christian
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Switchgrass Energy Storage, LLC
Utility
ComEd
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
TSS 903 Tovey 345 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about TSS 903 Tovey 345 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.