Kellam 24.9 kV
9.44 MW storage in Northampton, VA · In queue since April 2026 · Proposed COD September 2026
9.44 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5 months
Schedule
1 months past proposed COD
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-09-30
The Kellam 24.9 kV project is a proposed battery energy storage development in Northampton County, Virginia. Scout Storage LLC is developing the standalone storage project, which has a total capacity of 9.44 MW. It is planned to connect to the grid at the Kellam 24.9 kV point of interconnection, within the service territory of the Old Dominion Electric Cooperative (ODEC).
The project is listed in the PJM Interconnection queue under queue ID PJM-C01-2152 and requests Generation Interconnection service. It entered the queue on April 24, 2026, and is currently active in study phase C01, part of PJM's cycle-based interconnection process. The proposed commercial operation date is September 30, 2026. The available data does not indicate that an interconnection agreement has been executed.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Northampton
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Scout Storage LLC
Utility
ODEC
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Kellam 24.9 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Kellam 24.9 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.