Bremo 230 kV (PJM-C01-2124) — Project Summary

Queue ID
PJM-C01-2124
Capacity
800 MW
Technology
Gas
Status
active
Location
Fluvanna, VA
Region
PJM
Developer
Tenaska Power Generation, LLC
IA Status
—

Bremo 230 kV

PJM-C01-2124BetaActiveNatural GasPJMlive-pjm_cycle

800 MW generation in Fluvanna, VA · In queue since April 2026 · Proposed COD March 2033

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

800 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2033

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 11m

Study Phase

C01

Pre-Study0%
Queue EntryApr 27, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2033-03-31

Cross-source intelligence
Beta
Low confidence·1 sources·as of 2026-10-25
Expected COD
2033-03-31
From queue filing
Developer
Tenaska Power Generation, LLC
From queue filing
Status
Active
Active in the PJM queue (C01-2124, 800 MW gas, Fluvanna County, VA); no public evidence of permits, an executed IA, or construction.
Financing
Unannounced
About

Bremo 230 kV (PJM queue ID PJM-C01-2124) is a proposed 800 MW natural gas-fired generation project in Fluvanna County, Virginia. The project is being developed by Tenaska Power Generation, LLC. It would connect to the transmission system at the Bremo 230 kV point of interconnection, within the Dominion utility service territory.

The project is in the interconnection queue of PJM Interconnection, the regional transmission organization, and its status is active. It entered the queue on April 27, 2026, under the Generation Interconnection service type, and is assigned to study phase C01. The developer has proposed a commercial operation date of March 31, 2033.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

Fluvanna

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Tenaska Power Generation, LLC

Utility

Dominion

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Bremo 230 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
BEARGRDN18 KV CT1A
POI Substation
Bremo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.