Hatfield - Rhodes Lane 500 kV (PJM-C01-2105) — Project Summary

Queue ID
PJM-C01-2105
Capacity
1400 MW
Technology
Gas
Status
active
Location
Fayette, PA
Region
PJM
Developer
E Riverside Energy Center, LLC
IA Status
—

Hatfield - Rhodes Lane 500 kV

PJM-C01-2105BetaActiveNatural GasPJMlive-pjm_cycle

1,400 MW generation in Fayette, PA · In queue since April 2026 · Proposed COD December 2031

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

1,400 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 8m

Study Phase

C01

Pre-Study0%
Queue EntryApr 27, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-12-31

Cross-source intelligence
Beta
Medium confidence·5 sources·as of 2026-10-25
Expected COD
2031-12-31
From queue filing
Developer
NextEra Energy Resources
Filed as E Riverside Energy Center, LLC
Status
Active
Active in the PJM queue (queued 2026-04-27, no IA yet). The developer publicly announced the roughly $13B, 3-unit combined-cycle East Riverside Energy Center in Sep 2026, and the project is still at the proposal stage.
Financing
Unannounced
About

The Hatfield - Rhodes Lane 500 kV project (queue ID PJM-C01-2105) is a proposed natural gas-fired generation project in Fayette County, Pennsylvania. The project is being developed by E Riverside Energy Center, LLC and has a total proposed capacity of 1,400 MW. It would interconnect at the Hatfield - Rhodes Lane 500 kV point of interconnection, within the service territory of the utility APS.

The proposed project is listed in the interconnection queue of PJM Interconnection, the regional transmission organization. It entered the queue on April 27, 2026, under the service type of Generation Interconnection. Its queue status is active, and it is currently in study phase C01. The developer has proposed a commercial operation date of December 31, 2031. The available data does not indicate that an interconnection agreement has been executed.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

PA

County

Fayette

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

E Riverside Energy Center, LLC

Utility

APS

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Hatfield - Rhodes Lane 500 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
RONCO 18 KV CT2

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Hatfield - Rhodes Lane 500 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.