Carson - Rawlings 500kV (PJM-C01-2087) — Project Summary

Queue ID
PJM-C01-2087
Capacity
460.91 MW
Technology
Solar+Battery
Status
active
Location
Dinwiddie, VA
Region
PJM
Developer
Hanwha Energy USA Holdings Corp
IA Status
—

Carson - Rawlings 500kV

PJM-C01-2087BetaActiveSolar,Storage,HybridPJMlive-pjm_cycle

460.91 MW generation in Dinwiddie, VA · In queue since April 2026 · Proposed COD October 2031

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

460.91 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 6m

Study Phase

C01

Pre-Study0%
Queue EntryApr 27, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-10-01

Cross-source intelligence
Beta
Low confidence·3 sources·as of 2026-10-25
Expected COD
2031-10-01
From queue filing
Developer
Hanwha Energy USA Holdings Corp
From queue filing
Status
Active
Active in the PJM queue (C01 cycle, queued 2026-04-27). No IA executed and no public construction or permitting news. Sibling C01 requests (C01-2089, -2090, -2093) at the same Carson-Rawlings 500kV POI suggest a multi-request Hanwha cluster.
Financing
Unannounced
About

Carson - Rawlings 500kV is a proposed solar and battery storage hybrid generation project located in Dinwiddie County, Virginia. The development project is being advanced by Hanwha Energy USA Holdings Corp and has a total proposed capacity of 460.91 MW. It is classified as a solar, storage, and hybrid facility. Individual capacities for the solar and battery components are not specified in the available data. The project would connect to the transmission system at the Carson - Rawlings 500kV point of interconnection, within the service territory of Dominion.

The project is listed in the PJM Interconnection queue under queue ID PJM-C01-2087, with a queue entry date of April 27, 2026. It holds an active status and is currently in the C01 study phase, seeking Generation Interconnection service. The proposed commercial operation date is October 1, 2031. No interconnection agreement status is indicated in the available data, and the project is not linked to an existing operating plant in EIA records.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

Dinwiddie

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Hanwha Energy USA Holdings Corp

Utility

Dominion

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Carson - Rawlings 500kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
CARSON4 230 KV SR1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Carson - Rawlings 500kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.