Brandon Shores 230 kV
300 MW storage in Anne Arundel, MD · In queue since April 2026 · Proposed COD August 2029
300 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 4m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-08-31
Brandon Shores 230 kV (queue ID PJM-C01-2039) is a proposed 300 MW battery energy storage development project in Anne Arundel County, Maryland. The project is being developed by FS CT Project LLC and would connect to the transmission system at the Brandon Shores 230 kV point of interconnection, within the service territory of the utility BGE. It is classified as a standalone storage project.
The project is listed in the interconnection queue of PJM Interconnection, where it entered on April 25, 2026, with a request for Generation Interconnection service. Its status is active, and it is being evaluated in study phase C01, PJM's first cycle under its reformed interconnection process. The proposed commercial operation date is August 31, 2029.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MD
County
Anne Arundel
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
FS CT Project LLC
Utility
BGE
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Brandon Shores 230 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Brandon Shores 230 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.