Suffolk - Sunbury 230 kV
120 MW generation in Suffolk, VA · In queue since April 2026 · Proposed COD September 2031
120 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 5m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-09-15
The Suffolk - Sunbury 230 kV project, identified in the PJM interconnection queue as PJM-C01-2016, is a proposed solar and battery storage hybrid development project in Suffolk County, Virginia. Simi Solar, LLC is developing the project, which has a total capacity of 120 MW and combines solar generation with energy storage. The project data does not give separate capacities for the solar and storage components. It is designed to connect to the transmission system at the Suffolk - Sunbury 230 kV point of interconnection, within the service territory of Dominion.
The project entered the PJM Interconnection queue on April 27, 2026, and holds active status. It is being studied under the Generation Interconnection service type as part of PJM's Cycle 1 (C01) study phase. The developer has proposed a commercial operation date of September 15, 2031. The available data does not indicate that an interconnection agreement has been executed.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Suffolk
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Simi Solar, LLC
Utility
Dominion
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Suffolk - Sunbury 230 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SUFFOLK 230 KV SR_1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Suffolk - Sunbury 230 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.