Oak Green 230 kV
150 MW storage in Orange, VA · In queue since April 2026 · Proposed COD July 2030
150 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 3m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-07-17
Oak Green 230 kV is a proposed 150 MW battery energy storage development project in Orange County, Virginia. The project is being developed by Sunflower Storage LLC and would connect to the transmission system at the Oak Green 230 kV point of interconnection, within the service territory of Dominion. The proposed project consists solely of a storage component and does not include a co-located generation resource.
The project is listed in the PJM Interconnection queue under queue ID PJM-C01-2003 and has an active status. It entered the queue on April 28, 2026, and has requested Generation Interconnection service. The project is in PJM's C01 study phase, and it has a proposed commercial operation date of July 17, 2030.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Orange
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Sunflower Storage LLC
Utility
Dominion
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Oak Green 230 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- UNIONVIL115 KV TX1
- POI Substation
- Oak Green Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Oak Green 230 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.