Richland - Lockwood 138 kV
60 MW generation in Defiance, OH · In queue since April 2026 · Proposed COD June 2030
60 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 2m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-01
Richland - Lockwood 138 kV (queue ID PJM-C01-1983) is a proposed solar and battery storage hybrid generation project located in Defiance County, Ohio. Developed by DNPB1, LLC, the development project has a total proposed capacity of 60 MW and combines solar photovoltaic generation with energy storage. Individual capacities for the solar and storage components were not specified in the available queue data. The project is planned to connect to the grid at the Richland - Lockwood 138 kV point of interconnection, within the service territory of American Transmission Systems, Inc. (ATSI).
The project is in the interconnection queue of PJM Interconnection, the regional transmission organization serving Ohio and much of the Mid-Atlantic and Midwest. It entered the queue on April 17, 2026, under a Generation Interconnection service request, and is currently listed as active. It is being evaluated in PJM's Cycle 1 (C01) study phase. The proposed commercial operation date is June 1, 2030. No interconnection agreement status has been reported for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OH
County
Defiance
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
DNPB1, LLC
Utility
ATSI
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Richland - Lockwood 138 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SHRWOOD 69 KV T1
- POI Substation
- Lockwood Rd
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Richland - Lockwood 138 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.