South Butler - Varner 345 kV & South Butler - Dunton Lake 345 kV #1 & South Butler - Dunton Lake 345 kV #2
976.1 MW generation in DeKalb, IN · In queue since April 2026 · Proposed COD May 2031
976.1 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 1m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-05-31
The project identified in PJM's interconnection queue as PJM-C01-1952 is a proposed 976.1 MW natural gas-fired generation development project in DeKalb County, Indiana. The developer of record is Cortex Sycamore, LLC. The project's name and point of interconnection are both listed as "South Butler - Varner 345 kV & South Butler - Dunton Lake 345 kV #1 & South Butler - Dunton Lake 345 kV #2." This indicates the project would connect to three 345 kV transmission circuits running from the South Butler substation. The interconnecting utility is American Electric Power (AEP).
The project entered the PJM queue on April 24, 2026, under the Generation Interconnection service type. It is currently active and assigned to the C01 study phase, part of PJM's reformed cycle-based interconnection process. The proposed commercial operation date is May 31, 2031. The available data does not report the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
DeKalb
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Cortex Sycamore, LLC
Utility
AEP
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
South Butler - Varner 345 kV & South Butler - Dunton Lake 345 kV #1 & South Butler - Dunton Lake 345 kV #2
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about South Butler - Varner 345 kV & South Butler - Dunton Lake 345 kV #1 & South Butler - Dunton Lake 345 kV #2Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.