Beaver Valley - Hanna 345 kV & Bruce Mansfield - Hanna 345 kV (PJM-C01-1951) — Project Summary

Queue ID
PJM-C01-1951
Capacity
976.1 MW
Technology
Gas
Status
active
Location
Columbiana, OH
Region
PJM
Developer
Cortex Sycamore, LLC
IA Status
—

Beaver Valley - Hanna 345 kV & Bruce Mansfield - Hanna 345 kV

PJM-C01-1951BetaActiveNatural GasPJMlive-pjm_cycle

976.1 MW generation in Columbiana, OH · In queue since April 2026 · Proposed COD May 2031

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

976.1 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 1m

Study Phase

C01

Pre-Study0%
Queue EntryApr 24, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-05-31

Cross-source intelligence
Beta
Low confidence·3 sources·as of 2026-10-25
Expected COD
2031-05-31
From queue filing
Developer
Cortex Sycamore, LLC
From queue filing
Status
Active
Active in the PJM C01 queue (queue date 2026-04-24), with no interconnection agreement or public development milestones found.
Financing
Unannounced
About

The Beaver Valley - Hanna 345 kV & Bruce Mansfield - Hanna 345 kV project, identified in the PJM Interconnection queue as PJM-C01-1951, is a proposed natural gas-fired generation project located in Columbiana County, Ohio. The development project is sponsored by Cortex Sycamore, LLC and has a total proposed capacity of 976.1 MW. The project's name reflects its point of interconnection, which is on the Beaver Valley - Hanna 345 kV and Bruce Mansfield - Hanna 345 kV transmission lines within the service territory of American Transmission Systems, Inc. (ATSI).

The project entered the PJM queue on April 24, 2026, and remains in active status. It is being evaluated under PJM's Cycle 1 (C01) study phase as a Generation Interconnection request. The proposed commercial operation date is May 31, 2031. The provided data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OH

County

Columbiana

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Cortex Sycamore, LLC

Utility

ATSI

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Beaver Valley - Hanna 345 kV & Bruce Mansfield - Hanna 345 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
VALLEY4 230 KV SR_1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.