Hamilton 230 kV (PJM-C01-1882) — Project Summary

Queue ID
PJM-C01-1882
Capacity
500 MW
Technology
Battery
Status
active
Location
Loudoun, VA
Region
PJM
Developer
Cedar Holdco LLC
IA Status
—

Hamilton 230 kV

PJM-C01-1882BetaActiveStoragePJMlive-pjm_cycle

500 MW storage in Loudoun, VA · In queue since April 2026 · Proposed COD October 2030

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

500 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 6m

Study Phase

C01

Pre-Study0%
Queue EntryApr 27, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-10-31

Cross-source intelligence
Beta
Low confidence·2 sources·as of 2026-10-25
Expected COD
2030-10-31
From queue filing
Developer
Cedar Holdco LLC
From queue filing
Status
Active
Active in the PJM queue (C01-1882), 500 MW battery in Loudoun County, VA. The queue date is 2026-04-27 and no IA is executed. No public construction or permitting activity found.
Financing
Unannounced
About

Hamilton 230 kV (PJM queue ID PJM-C01-1882) is a proposed 500 MW battery energy storage development project in Loudoun County, Virginia. The project is being developed by Cedar Holdco LLC and would connect to the transmission system at the Hamilton 230 kV point of interconnection within the Dominion utility service territory. It is classified as a standalone storage project, with battery storage as its sole technology component.

The project is listed as active in the PJM Interconnection queue, which it entered on April 27, 2026, under a Generation Interconnection service request. It is currently in the C01 study phase, part of PJM's cycle-based interconnection process. The proposed commercial operation date is October 31, 2030. The available data does not report an executed interconnection agreement, and the project has no recorded match to an existing operating plant in EIA data.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

Loudoun

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Cedar Holdco LLC

Utility

Dominion

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Hamilton 230 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
HAMILTN 230 KV SR1
POI Substation
Hamilton Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.