Collins 345 kV (PJM-C01-1808) — Project Summary

Queue ID
PJM-C01-1808
Capacity
940 MW
Technology
Nuclear
Status
active
Location
Grundy, IL
Region
PJM
Developer
NRG Tully Energy Center LLC
IA Status
—

Collins 345 kV

PJM-C01-1808BetaActiveNuclearPJMlive-pjm_cycle

940 MW generation in Grundy, IL · In queue since April 2026 · Proposed COD May 2036

BA: PJMISO/RTO: PJMNERC: SERCRC: MISO

940 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2036

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 1m

Study Phase

C01

Pre-Study0%
Queue EntryApr 24, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2036-05-01

Cross-source intelligence
Beta
Low confidence·3 sources·as of 2026-10-25
Expected COD
2036-05-01
From queue filing
Developer
NRG Tully Energy Center LLC
From queue filing
Status
Active
Active in the PJM queue (filed 2026-04-24), 940 MW nuclear at Collins 345 kV, Grundy County, IL. No IA executed, and no public construction or permitting activity found.
Financing
Unannounced
About

Collins 345 kV (queue ID PJM-C01-1808) is a proposed 940 MW nuclear generation project in Grundy County, Illinois. The development project is being pursued by NRG Tully Energy Center LLC. It would connect to the transmission system at the Collins 345 kV point of interconnection, within the service territory of the utility ComEd.

The project is listed as active in the PJM Interconnection queue. It entered the queue on April 24, 2026, as a generation interconnection request and is being evaluated in study cycle C01. Its proposed commercial operation date is May 1, 2036. The available data does not indicate the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

Grundy

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

NRG Tully Energy Center LLC

Utility

ComEd

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Collins 345 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
433 CHAN138 KV TR76 34
POI Substation
Collins Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Collins 345 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.