Collins 345 kV
940 MW generation in Grundy, IL · In queue since April 2026 · Proposed COD May 2036
940 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2036
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
10y 1m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2036-05-01
Collins 345 kV (queue ID PJM-C01-1808) is a proposed 940 MW nuclear generation project in Grundy County, Illinois. The development project is being pursued by NRG Tully Energy Center LLC. It would connect to the transmission system at the Collins 345 kV point of interconnection, within the service territory of the utility ComEd.
The project is listed as active in the PJM Interconnection queue. It entered the queue on April 24, 2026, as a generation interconnection request and is being evaluated in study cycle C01. Its proposed commercial operation date is May 1, 2036. The available data does not indicate the status of an interconnection agreement for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Grundy
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
NRG Tully Energy Center LLC
Utility
ComEd
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Collins 345 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 433 CHAN138 KV TR76 34
- POI Substation
- Collins Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Collins 345 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.