Galion 345 kV
350 MW storage in Morrow, OH · In queue since April 2026 · Proposed COD October 2029
350 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 6m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-10-01
Galion 345 kV (PJM queue ID PJM-C01-1805) is a proposed 350 MW battery energy storage development project in Morrow County, Ohio. The project is being developed by Orchid Storage, LLC and would connect to the transmission system at the Galion 345 kV point of interconnection, within the service territory of American Transmission Systems, Inc. (ATSI). The project consists solely of a storage component and is classified as a standalone storage facility.
The project entered the PJM Interconnection queue on April 23, 2026, under a generation interconnection service request, and is currently active. It is being evaluated in PJM's Cycle 1 (C01) study phase under the transmission operator's reformed interconnection process. The developer has proposed a commercial operation date of October 1, 2029. The provided data does not indicate that an interconnection agreement has been executed.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OH
County
Morrow
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Orchid Storage, LLC
Utility
ATSI
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Galion 345 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- GALION 34.5 KV BLOSSOSP
- POI Substation
- Galion Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Galion 345 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.