William 138 kV
58.7 MW generation in Tucker, WV · In queue since April 2026 · Proposed COD June 2028
58.7 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 2m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-01
William 138 kV (queue ID PJM-C01-1733) is a proposed 58.7 MW wind generation project in Tucker County, West Virginia. The development project is sponsored by Catamount Wind LLC and would connect to the transmission system at the William 138 kV point of interconnection, within the service territory of APS (Allegheny Power System). The project has requested Generation Interconnection service.
The project is listed in the PJM Interconnection queue, which it entered on April 27, 2026. It is assigned to PJM's C01 study phase and currently holds an active status. The developer has proposed a commercial operation date of June 1, 2028. The available queue data does not report an interconnection agreement for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WV
County
Tucker
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Catamount Wind LLC
Utility
APS
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
William 138 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- PRINCWIL230 KV TX1
- POI Substation
- Prince William Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about William 138 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.