Lutz 138 kV
150 MW storage in Ross, OH · In queue since April 2026 · Proposed COD June 2031
150 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 2m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-06-30
Lutz 138 kV (PJM queue ID PJM-C01-1715) is a proposed battery energy storage development project in Ross County, Ohio. Developed by AE Renewable Development, LLC, the project has a total proposed capacity of 150 MW and is classified as a standalone storage project. It would interconnect at the Lutz 138 kV point of interconnection within the service territory of AEP (American Electric Power).
The project entered the PJM Interconnection queue on April 27, 2026, as a Generation Interconnection request and is currently listed with an active status. It is part of PJM's Cycle 1 (C01) study phase under the regional transmission organization's reformed interconnection process. The project has a proposed commercial operation date of June 30, 2031. No interconnection agreement status is reported in the available data.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OH
County
Ross
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
AE Renewable Development, LLC
Utility
AEP
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Lutz 138 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- LUTZ 34.5 KV YELWBDSP
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Lutz 138 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.